,

Colchester Hospital, ENGLAND

Architects render of teh new Colchester Hospital

Construction is underway on the Dame Clare Marx Building, a new orthopaedic centre at Colchester Hospital. With an estimated cost of £64 million, this facility is being built to accommodate patients from Essex and Suffolk requiring planned orthopaedic procedures, including hip and knee replacements.

KFK will be undertaking a full envelope design of the modular hospital building, consisting of:

  • Nvelope Backing Grid (HHB, Rails, C Channels)
  • Rockwool Class A Insulation
  • Rockpanel Class A Rainscreen Panels
  • 3mm PPC alum Feature Flashings and Cappings
  • Active and Non Active Louvres to Plant Room Areas